Construction of 4-Lane Greenfield Expressway spur from Delhi-Vadodara Greenfield expressway near Bandikui to Jaipur in Bharatmala Pariyojana Phase-I in the state of Rajasthan on Hybrid Annuity Mode

SPV Incorporated on: 18.04.2022
GRIL equity interest control in SPV: 100%
Total Length of the Project: 66.916 km
Authority: National Highways Authority of India
Independent Engineer: LN Malviya Infra Project Pvt. Ltd. in Association with Pioneer Infra Consultants Pvt. Ltd.
Bid Project Cost: 1368.00 Cr.
Date of LoA: 30.03.2022
Agreement signed on: 14.06.2022
Appointed Date: 11.11.2022